Hammiyala Collective
05

Infrastructure

Roads, water, pond.

8 HP motor repaired. Movable trolley installed. Water tank covered with green shade net. 1.2 km road work commenced. Pond expanded to 2,600 sq ft / 2,00,000 litres.

Tank